Update construction

The construction of HAUT is progressing well. Although there is not much to see from the street, everything is happening “below ground level”. Around 100 piles are now in the ground, supporting the building to a depth of 30 meters. The concrete basement…

Custom layouts for Zuid residences

The Interior Architects at Studio Framework have made a number of additional floor plans for Zuid, which are based on conversations with buyers and interested parties. For example, the kitchen has been angled so the dining table connects more to…

Why HAUT?

HAUT is made from wood. A centuries-old building material, yet at the same time an innovation in sustainable construction. Wood does not emit CO2, but naturally absorbs it. Have a look at our video about HAUT. 

Sales phase 2 have started

On Friday 14 September we met a lot of potential buyers at our event in George Marina, the restaurant next to HAUT, direct at Amstel river. We had a great afternoon and evening. From 15 September 2018 you can apply…

2020 © HAUT Design by FPW Disclaimer